<br />
<b>Notice</b>:  Function _load_textdomain_just_in_time was called <strong>incorrectly</strong>. Translation loading for the <code>acf</code> domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the <code>init</code> action or later. Please see <a href="https://developer.wordpress.org/advanced-administration/debug/debug-wordpress/">Debugging in WordPress</a> for more information. (This message was added in version 6.7.0.) in <b>/home/vqgr4791/llc.bypi.fr/2021/arst/wp-includes/functions.php</b> on line <b>6170</b><br />
<br />
<b>Notice</b>:  Function _load_textdomain_just_in_time was called <strong>incorrectly</strong>. Translation loading for the <code>simple-custom-post-order</code> domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the <code>init</code> action or later. Please see <a href="https://developer.wordpress.org/advanced-administration/debug/debug-wordpress/">Debugging in WordPress</a> for more information. (This message was added in version 6.7.0.) in <b>/home/vqgr4791/llc.bypi.fr/2021/arst/wp-includes/functions.php</b> on line <b>6170</b><br />
{"id":4083,"date":"2020-03-19T09:41:20","date_gmt":"2020-03-19T08:41:20","guid":{"rendered":"http:\/\/cabinet-arst.com\/?p=4083"},"modified":"2020-03-19T09:41:20","modified_gmt":"2020-03-19T08:41:20","slug":"covid-19-y-los-contratos-y-si-la-mejor-solucion-contractual-fuese-la-negociacion","status":"publish","type":"post","link":"https:\/\/llc.bypi.fr\/2021\/arst\/2020\/03\/19\/covid-19-y-los-contratos-y-si-la-mejor-solucion-contractual-fuese-la-negociacion\/","title":{"rendered":"Covid-19 y los contratos : \u00bfY si la mejor soluci\u00f3n contractual fuese la negociaci\u00f3n ?"},"content":{"rendered":"<p>[et_pb_section fb_built=\u00a0\u00bb1&Prime; _builder_version=\u00a0\u00bb3.22&Prime;][et_pb_row _builder_version=\u00a0\u00bb3.25&Prime; background_size=\u00a0\u00bbinitial\u00a0\u00bb background_position=\u00a0\u00bbtop_left\u00a0\u00bb background_repeat=\u00a0\u00bbrepeat\u00a0\u00bb][et_pb_column type=\u00a0\u00bb4_4&Prime; _builder_version=\u00a0\u00bb3.25&Prime; custom_padding=\u00a0\u00bb|||\u00a0\u00bb custom_padding__hover=\u00a0\u00bb|||\u00a0\u00bb][et_pb_text content_tablet=\u00a0\u00bb<\/p>\n<p>France has just passed to stage 3 of the Covid19 epidemic that is currently sweeping through the country. Many sectors (tourism, transport, events, hotels, entertainment, culture, etc.) are already being impacted by the strong drop in demand and the cancellations caused by the measures taken by the public authorities and customer behaviour.<\/p>\n<p>With regard to public procurement, the Minister of the Economy and Finance has publicly announced that the State\u2019s doctrine would be to consider that the Covid19 is a case of force majeure intended to exonerate the parties from their contractual obligations.<\/p>\n<p>For the private sector, the delay or impediment in the performance of the contract will in particular be understood in the light of the concept of force majeure as defined by the contract itself (in which case it is to this definition that reference should be made to determine whether the Covid19 does indeed constitute force majeure) or, failing this, by article 1218 paragraph 1 of the French Civil Code according to which \u201cthere is force majeure in contractual matters where an event is beyond the debtor\u2019s control, which could not reasonably have been foreseen at the time of the conclusion of the contract and whose effects cannot be avoided by appropriate measures, prevents the performance of his obligation by the debtor.\u201d<\/p>\n<p>It is recalled that, according to Article 1218(2) of the French Civil Code, the degree of the case of force majeure has a direct influence on the scope of its exonerating effect. Therefore, \u201cif the impediment is temporary, the performance of the obligation is suspended unless the resulting delay justifies termination of the contract. If the impediment is permanent, the contract is terminated by operation of law and the parties are discharged from their obligations under the conditions set out in articles 1351 and 1351-1.\u201d<\/p>\n<p>In the absence of a contractual definition to specify the case of epidemics, the universality of Article 1218 of the French Civil Code will oblige lawyers to say whether the Covid19 phenomenon and\/or the events which resulted from it were events which were unforeseeable at the time of concluding the contract, which became irresistible at the time when the contract had to be performed, and will probably turn to the caselaw.<\/p>\n<p>The decisions, few in number, which have been issued on this question all point in the direction of a refusal to assimilate an epidemic to a case of force majeure capable of exonerating the debtor from liability for a contractual obligation.<\/p>\n<p>Therefore, whether we are dealing with Dengue fever, the H1N1 virus, Chikungunya, seasonal flu, avian flu, or even the plague, the decisions published to date have all led to a refusal to recognise the existence of a case of force majeure.<\/p>\n<p>Even if, in view of the strength of the Covid19 epidemic, a change of paradigm cannot be ruled out, particularly having regard to the decisions taken by the executive bodies which are themselves likely to affect the conditions for the performance of contracts, debtors should therefore assume that the impossibility of performing their obligations because of this epidemic is not necessarily such as to exonerate them from their contractual liability, but rather to encourage them to try, upstream, to negotiate with their creditors an adjustment of their contract.<\/p>\n<p>In the absence of a negotiated solution, they may, if their contract does not prohibit them from doing so, turn to Article 1195 of the French Civil Code, according to which \u201cif an unforeseeable change of circumstances at the time of the conclusion of the contract makes performance excessively onerous for a party who had not agreed to assume the risk, that party may request a renegotiation of the contract from his cocontractor (&#8230;). In the event of refusal or failure of the renegotiation, the parties may agree on the termination of the contract, on the date and under the conditions that they determine, or ask the judge by mutual agreement to adapt it. If no agreement is reached within a reasonable period, the court may, at the request of one of the parties, review or terminate the contract on the date and under the conditions which it shall determine.\u201d<\/p>\n<p>Much criticised when it was adopted because of the cumbersome renegotiation procedure which it provides for, Article 1195 of the French Civil Code could today become the best contractual remedy against the misdeeds of the Covid19.<\/p>\n<p>For professionals who have taken out \u201cbusiness interruption\u201d insurance coverage, the question could finally arise as to whether losses related to Covid19 could fall within the scope of the guarantee. However, in the absence of \u201cmaterial damage\u201d at the origin of the business interruption, it is the very existence of a covered loss that is likely to be lacking, if the insurance contract does not also provide for a specific exclusion of the guarantee for epidemics.<\/p>\n<p>With regard to travel and stays, Article L. 211-14 II of the French Tourism Code gives the traveller the right to cancel his contract without charge (but without additional compensation) in the event of \u201cexceptional and unavoidable circumstances occurring at or near the place of destination\u201d having \u201csignificant consequences on the performance of the contract or on the means of transport for the travellers\u201d.<\/p>\n<p>Here again, the question will arise as to whether the Covid19 meets the legal definition of exceptional circumstances, being pointed out that the courts could have a more flexible appreciation of the matter as far as individual consumers are concerned.<\/p>\n<p>In view of these many uncertainties, the most appropriate recommendation is not to wait for the situation to worsen and to try to negotiate, with its customers, subsuppliers and business partners, a negotiated solution consisting in arranging contractually, by way of a rider, the postponement or cancellation of services which cannot be provided.<\/p>\n<p>To this end, Arst Law Firm has developed a \u201cCovid19\u201d clause which may serve as a basis for negotiation and which must, of course, be adapted and supplemented in order to fit perfectly into the contract it is intended to integrate.<\/p>\n<\/p>\n<p>Do not hesitate to contact us.<\/p>\n<p><img class=%22wp-image-3659 alignnone %22 src=%22https:\/\/llc.bypi.fr\/2021\/arst\/wp-content\/uploads\/2020\/03\/numero.png%22 alt=%22%22 width=%22244%22 height=%2241%22 \/><\/p>\n<\/p>\n<p>Download<\/p>\n<p><a href=%22https:\/\/llc.bypi.fr\/2021\/arst\/wp-content\/uploads\/2020\/03\/ENG-COVID-19-AND-CONTRACT-LAW-.pdf%22 data-et-target-link=%22_blank%22 rel=%22noopener noreferrer%22>English<\/a><\/p>\n<p><a href=%22https:\/\/llc.bypi.fr\/2021\/arst\/wp-content\/uploads\/2020\/03\/ESP-COVID19-Contratos.pdf%22 data-et-target-link=%22_blank%22 rel=%22noopener noreferrer%22>Spanish<\/a><\/p>\n<\/p>\n<p><script src=%22https:\/\/platform.linkedin.com\/in.js%22 type=%22text\/javascript%22>lang: en_US<\/script><br \/><script type=%22IN\/Share%22 data-url=%22http:\/\/cabinet-arst.com\/covid-19-and-contract-law-what-if-the-best-contractual-solution-was-negotiation\/%22><\/script><\/p>\n<p><a class=%22twitter-share-button%22 href=%22https:\/\/twitter.com\/share?ref_src=twsrc%5Etfw%22 data-show-count=%22false%22>Tweet<\/a><script async=%22%22 src=%22https:\/\/platform.twitter.com\/widgets.js%22 charset=%22utf-8%22><\/script><\/p>\n<p>\u00a0\u00bb content_phone=\u00a0\u00bb<\/p>\n<p>France has just passed to stage 3 of the Covid19 epidemic that is currently sweeping through the country. Many sectors (tourism, transport, events, hotels, entertainment, culture, etc.) are already being impacted by the strong drop in demand and the cancellations caused by the measures taken by the public authorities and customer behaviour.<\/p>\n<p>With regard to public procurement, the Minister of the Economy and Finance has publicly announced that the State\u2019s doctrine would be to consider that the Covid19 is a case of force majeure intended to exonerate the parties from their contractual obligations.<\/p>\n<p>For the private sector, the delay or impediment in the performance of the contract will in particular be understood in the light of the concept of force majeure as defined by the contract itself (in which case it is to this definition that reference should be made to determine whether the Covid19 does indeed constitute force majeure) or, failing this, by article 1218 paragraph 1 of the French Civil Code according to which \u201cthere is force majeure in contractual matters where an event is beyond the debtor\u2019s control, which could not reasonably have been foreseen at the time of the conclusion of the contract and whose effects cannot be avoided by appropriate measures, prevents the performance of his obligation by the debtor.\u201d<\/p>\n<p>It is recalled that, according to Article 1218(2) of the French Civil Code, the degree of the case of force majeure has a direct influence on the scope of its exonerating effect. Therefore, \u201cif the impediment is temporary, the performance of the obligation is suspended unless the resulting delay justifies termination of the contract. If the impediment is permanent, the contract is terminated by operation of law and the parties are discharged from their obligations under the conditions set out in articles 1351 and 1351-1.\u201d<\/p>\n<p>In the absence of a contractual definition to specify the case of epidemics, the universality of Article 1218 of the French Civil Code will oblige lawyers to say whether the Covid19 phenomenon and\/or the events which resulted from it were events which were unforeseeable at the time of concluding the contract, which became irresistible at the time when the contract had to be performed, and will probably turn to the caselaw.<\/p>\n<p>The decisions, few in number, which have been issued on this question all point in the direction of a refusal to assimilate an epidemic to a case of force majeure capable of exonerating the debtor from liability for a contractual obligation.<\/p>\n<p>Therefore, whether we are dealing with Dengue fever, the H1N1 virus, Chikungunya, seasonal flu, avian flu, or even the plague, the decisions published to date have all led to a refusal to recognise the existence of a case of force majeure.<\/p>\n<p>Even if, in view of the strength of the Covid19 epidemic, a change of paradigm cannot be ruled out, particularly having regard to the decisions taken by the executive bodies which are themselves likely to affect the conditions for the performance of contracts, debtors should therefore assume that the impossibility of performing their obligations because of this epidemic is not necessarily such as to exonerate them from their contractual liability, but rather to encourage them to try, upstream, to negotiate with their creditors an adjustment of their contract.<\/p>\n<p>In the absence of a negotiated solution, they may, if their contract does not prohibit them from doing so, turn to Article 1195 of the French Civil Code, according to which \u201cif an unforeseeable change of circumstances at the time of the conclusion of the contract makes performance excessively onerous for a party who had not agreed to assume the risk, that party may request a renegotiation of the contract from his cocontractor (&#8230;). In the event of refusal or failure of the renegotiation, the parties may agree on the termination of the contract, on the date and under the conditions that they determine, or ask the judge by mutual agreement to adapt it. If no agreement is reached within a reasonable period, the court may, at the request of one of the parties, review or terminate the contract on the date and under the conditions which it shall determine.\u201d<\/p>\n<p>Much criticised when it was adopted because of the cumbersome renegotiation procedure which it provides for, Article 1195 of the French Civil Code could today become the best contractual remedy against the misdeeds of the Covid19.<\/p>\n<p>For professionals who have taken out \u201cbusiness interruption\u201d insurance coverage, the question could finally arise as to whether losses related to Covid19 could fall within the scope of the guarantee. However, in the absence of \u201cmaterial damage\u201d at the origin of the business interruption, it is the very existence of a covered loss that is likely to be lacking, if the insurance contract does not also provide for a specific exclusion of the guarantee for epidemics.<\/p>\n<p>With regard to travel and stays, Article L. 211-14 II of the French Tourism Code gives the traveller the right to cancel his contract without charge (but without additional compensation) in the event of \u201cexceptional and unavoidable circumstances occurring at or near the place of destination\u201d having \u201csignificant consequences on the performance of the contract or on the means of transport for the travellers\u201d.<\/p>\n<p>Here again, the question will arise as to whether the Covid19 meets the legal definition of exceptional circumstances, being pointed out that the courts could have a more flexible appreciation of the matter as far as individual consumers are concerned.<\/p>\n<p>In view of these many uncertainties, the most appropriate recommendation is not to wait for the situation to worsen and to try to negotiate, with its customers, subsuppliers and business partners, a negotiated solution consisting in arranging contractually, by way of a rider, the postponement or cancellation of services which cannot be provided.<\/p>\n<p>To this end, Arst Law Firm has developed a \u201cCovid19\u201d clause which may serve as a basis for negotiation and which must, of course, be adapted and supplemented in order to fit perfectly into the contract it is intended to integrate.<\/p>\n<\/p>\n<p>Do not hesitate to contact us.<\/p>\n<p><img class=%22wp-image-3659 alignnone %22 src=%22https:\/\/llc.bypi.fr\/2021\/arst\/wp-content\/uploads\/2020\/03\/numero.png%22 alt=%22%22 width=%22244%22 height=%2241%22 \/><\/p>\n<\/p>\n<p>Download<\/p>\n<p><a href=%22https:\/\/llc.bypi.fr\/2021\/arst\/wp-content\/uploads\/2020\/03\/ENG-COVID-19-AND-CONTRACT-LAW-.pdf%22 data-et-target-link=%22_blank%22 rel=%22noopener noreferrer%22>English<\/a><\/p>\n<p><a href=%22https:\/\/llc.bypi.fr\/2021\/arst\/wp-content\/uploads\/2020\/03\/ESP-COVID19-Contratos.pdf%22 data-et-target-link=%22_blank%22 rel=%22noopener noreferrer%22>Spanish<\/a><\/p>\n<\/p>\n<p><script src=%22https:\/\/platform.linkedin.com\/in.js%22 type=%22text\/javascript%22>lang: en_US<\/script><br \/><script type=%22IN\/Share%22 data-url=%22http:\/\/cabinet-arst.com\/covid-19-and-contract-law-what-if-the-best-contractual-solution-was-negotiation\/%22><\/script><\/p>\n<p><a class=%22twitter-share-button%22 href=%22https:\/\/twitter.com\/share?ref_src=twsrc%5Etfw%22 data-show-count=%22false%22>Tweet<\/a><script async=%22%22 src=%22https:\/\/platform.twitter.com\/widgets.js%22 charset=%22utf-8%22><\/script><\/p>\n<p>\u00a0\u00bb content_last_edited=\u00a0\u00bbon|desktop\u00a0\u00bb _builder_version=\u00a0\u00bb4.4.1&Prime; background_size=\u00a0\u00bbinitial\u00a0\u00bb background_position=\u00a0\u00bbtop_left\u00a0\u00bb background_repeat=\u00a0\u00bbrepeat\u00a0\u00bb]<\/p>\n<p style=\"text-align: justify;\">Francia acaba de pasar a la fase 3 de la epidemia de Coronavirus que actualmente est\u00e1 arrasando el pa\u00eds. Muchos sectores (turismo, transporte, eventos, hoteles, entretenimiento, cultura, etc.) ya est\u00e1n siendo impactados por la fuerte ca\u00edda de la demanda y las cancelaciones causadas por las medidas tomadas por los poderes p\u00fablicos, as\u00ed como al comportamiento de los clientes.<\/p>\n<p style=\"text-align: justify;\">En lo que respecta a la contrataci\u00f3n p\u00fablica, el Ministro de Econom\u00eda y Finanzas franc\u00e9s ha anunciado p\u00fablicamente que la doctrina del Estado consistir\u00eda en considerar el Covid19 como un caso de fuerza mayor destinado a exonerar a las partes de sus obligaciones contractuales.<\/p>\n<p style=\"text-align: justify;\">Para el sector privado, el retraso o el impedimento en el cumplimiento del contrato se entender\u00e1, en particular, a la luz del concepto de fuerza mayor definido en el propio contrato (en cuyo caso ser\u00e1 esta definici\u00f3n la que deba considerarse como referencia para determinar si el Covid19 constituye efectivamente un caso de fuerza mayor) o, en su defecto, por el art\u00edculo 1218, p\u00e1rrafo 1, del C\u00f3digo Civil franc\u00e9s , seg\u00fan el cual \u201c<em>hay fuerza mayor en materia contractual cuando un acontecimiento ajeno al deudor, que no pod\u00eda preverse razonablemente en el momento de la celebraci\u00f3n del contrato y cuyos efectos no pueden evitarse mediante medidas apropiadas, impide el cumplimiento de su obligaci\u00f3n por el deudor<\/em>.\u201d<\/p>\n<p style=\"text-align: justify;\">Cabe recordar que, de acuerdo con el p\u00e1rrafo 2 del art\u00edculo 1218 del C\u00f3digo Civil franc\u00e9s, el grado de intensidad del caso de fuerza mayor influye directamente en el alcance de su efecto exonerante. As\u00ed, \u201c<em>si el impedimento es temporal, se suspende el cumplimiento de la obligaci\u00f3n a menos que el retraso justifique la terminaci\u00f3n del contrato. Si el impedimento es permanente, el contrato se extingue por efecto de la ley y las partes quedan liberadas de sus obligaciones en las condiciones establecidas en los art\u00edculos 1351 y 1351-1.<\/em>\u201d<\/p>\n<p style=\"text-align: justify;\">A falta de una definici\u00f3n contractual que precise el caso de las epidemias, la universalidad del art\u00edculo 1218 del C\u00f3digo Civil franc\u00e9s obligar\u00e1 a los juristas a decidir si el fen\u00f3meno Covid19 y\/o los acontecimientos que acaecieron pueden ser considerados como imprevisibles en el momento de la celebraci\u00f3n del contrato, que se volvieron irresistibles en el momento en que hubo que ejecutarlo, y probablemente recurrir a la jurisprudencia.<\/p>\n<p style=\"text-align: justify;\">Las decisiones, poco abundantes en la materia, que se han adoptado apuntan, todas ellas, en la direcci\u00f3n de una negativa a asimilar una epidemia a un caso de fuerza mayor capaz de eximir al deudor de la responsabilidad de una obligaci\u00f3n contractual.<\/p>\n<p style=\"text-align: justify;\">As\u00ed, ya se trate del dengue, del virus H1N1, del chikungunya, de la gripe estacional, de la gripe aviar o incluso de la peste, las decisiones publicadas hasta la fecha han llevado a la negativa de los tribunales de reconocer la existencia de un caso de fuerza mayor en tales situaciones.<\/p>\n<p style=\"text-align: justify;\">Aunque, dada la magnitud de la epidemia de Covid19, no puede descartarse un cambio de paradigma, en particular habida cuenta de las decisiones adoptadas por el Poder Ejecutivo, que a su vez pueden afectar a las condiciones de ejecuci\u00f3n de los contratos, los deudores deben asumir que la imposibilidad de cumplir sus obligaciones debido a de esta epidemia no es necesariamente suficiente para exonerarlos de su responsabilidad contractual, sino que los alienta a intentar, en la fase inicial, negociar con sus acreedores un ajuste del contrato.<\/p>\n<p style=\"text-align: justify;\">A falta de acuerdo, las partes podr\u00e1n, si su contrato no se lo proh\u00edbe, recurrir al art\u00edculo 1195 del C\u00f3digo Civil franc\u00e9s, seg\u00fan el cual \u201c<em>si un cambio de circunstancias imprevisibles en el momento de la celebraci\u00f3n del contrato hace excesivamente onerosa la ejecuci\u00f3n para una parte que no hab\u00eda aceptado asumir el riesgo, \u00e9sta podr\u00e1 solicitar a su cocontratante una renegociaci\u00f3n del contrato (&#8230;). En caso de rechazo o de fracaso de la renegociaci\u00f3n, las partes podr\u00e1n acordar la terminaci\u00f3n del contrato, en la fecha y en las condiciones que ellos determinen, o pedir al juez de mutuo acuerdo que lo adapte. Si no se llega a un acuerdo en un plazo razonable, el tribunal podr\u00e1, a petici\u00f3n de una de las partes, revisar o rescindir el contrato en la fecha y en las condiciones que determine<\/em>.\u201d<\/p>\n<p style=\"text-align: justify;\">Muy criticado cuando se adopt\u00f3 debido al complejo procedimiento de renegociaci\u00f3n que prev\u00e9, el art\u00edculo 1195 del C\u00f3digo Civil franc\u00e9s podr\u00eda convertirse actualmente en el mejor recurso contractual contra los efectos adversos causados por el Covid19.<\/p>\n<p style=\"text-align: justify;\">En el caso de los profesionales que han contratado la cobertura del seguro de \u201cp\u00e9rdidas de explotaci\u00f3n\u201d, podr\u00eda plantearse finalmente la cuesti\u00f3n de si las p\u00e9rdidas relacionadas con el Covid19 pueden entrar en el \u00e1mbito de las p\u00f3lizas. Sin embargo, en ausencia de \u201cda\u00f1os materiales\u201d en el origen de la interrupci\u00f3n de la actividad, lo que probablemente falte es la existencia misma de una p\u00e9rdida cubierta, si el contrato de seguro no prev\u00e9 tambi\u00e9n una exclusi\u00f3n espec\u00edfica de la cobertura por epidemias.<\/p>\n<p style=\"text-align: justify;\">En lo que respecta a los viajes y a las estancias, el art\u00edculo L. 211-14 II del C\u00f3digo de Turismo franc\u00e9s otorga al viajero el derecho a rescindir su contrato sin gastos (pero sin indemnizaci\u00f3n adicional) en caso de que \u201c<em>circunstancias excepcionales e inevitables se produzcan en el lugar de destino o en sus proximidades\u201d <\/em>y tengan<em> \u201cconsecuencias importantes en la ejecuci\u00f3n del contrato o en el transporte de los viajeros<\/em>.\u201d<\/p>\n<p style=\"text-align: justify;\">Tambi\u00e9n en este caso se plantear\u00e1 la cuesti\u00f3n de si el Covid19 se ajusta a la definici\u00f3n jur\u00eddica de circunstancias excepcionales, teniendo en cuenta que los tribunales podr\u00edan tener una apreciaci\u00f3n m\u00e1s flexible de la cuesti\u00f3n en lo que respecta a los consumidores individuales.<\/p>\n<p style=\"text-align: justify;\">A la vista de todas estas incertidumbres, la recomendaci\u00f3n m\u00e1s apropiada es no esperar a que la situaci\u00f3n empeore y tratar de negociar con sus clientes, sub-proveedores y socios comerciales un acuerdo que consista en organizar contractualmente, mediante una cl\u00e1usula adicional, el aplazamiento o la cancelaci\u00f3n de los servicios que no se puedan prestar dadas las circunstancias.<\/p>\n<p style=\"text-align: justify;\">Con ese fin, Arst Abogados ha implementado una cl\u00e1usula \u201cCovid19\u201d que puede servir de base para la negociaci\u00f3n de los contratos y que, evidentemente, debe ser adaptada y completada seg\u00fan el caso para que encaje perfectamente con el contrato que se pretende modificar.<\/p>\n<p style=\"text-align: justify;\">No dude en ponerse en contacto con nosotros.<\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-3659 alignnone \" src=\"https:\/\/llc.bypi.fr\/2021\/arst\/wp-content\/uploads\/2020\/03\/numero.png\" alt=\"\" width=\"244\" height=\"41\" srcset=\"https:\/\/llc.bypi.fr\/2021\/arst\/wp-content\/uploads\/2020\/03\/numero.png 350w, https:\/\/llc.bypi.fr\/2021\/arst\/wp-content\/uploads\/2020\/03\/numero-300x51.png 300w\" sizes=\"auto, (max-width: 244px) 100vw, 244px\" \/><\/p>\n<p style=\"text-align: justify;\">Download<\/p>\n<p style=\"text-align: justify;\"><a href=\"https:\/\/llc.bypi.fr\/2021\/arst\/wp-content\/uploads\/2020\/03\/ENG-COVID-19-AND-CONTRACT-LAW-.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">English<\/a><\/p>\n<p style=\"text-align: justify;\"><a href=\"https:\/\/llc.bypi.fr\/2021\/arst\/wp-content\/uploads\/2020\/03\/ESP-COVID19-Contratos.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">Spanish<\/a><\/p>\n<p style=\"text-align: justify;\"><script src=\"https:\/\/platform.linkedin.com\/in.js\" type=\"text\/javascript\">lang: en_US<\/script><br \/><script type=\"IN\/Share\" data-url=\"http:\/\/cabinet-arst.com\/covid-19-and-contract-law-what-if-the-best-contractual-solution-was-negotiation\/\"><\/script><\/p>\n<p style=\"text-align: justify;\"><a class=\"twitter-share-button\" href=\"https:\/\/twitter.com\/share?ref_src=twsrc%5Etfw\" data-show-count=\"false\">Tweet<\/a><script async=\"\" src=\"https:\/\/platform.twitter.com\/widgets.js\" charset=\"utf-8\"><\/script><\/p>\n<p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][et_pb_row column_structure=\u00a0\u00bb1_2,1_2&Prime; _builder_version=\u00a0\u00bb4.3.4&Prime;][et_pb_column type=\u00a0\u00bb1_2&Prime; _builder_version=\u00a0\u00bb4.3.4&Prime;][et_pb_team_member name=\u00a0\u00bbMORGAN JAMET\u00a0\u00bb position=\u00a0\u00bbavocat associ\u00e9\u00a0\u00bb image_url=\u00a0\u00bbhttp:\/\/cabinet-arst.com\/wp-content\/uploads\/2019\/01\/28nov0286.jpg\u00a0\u00bb linkedin_url=\u00a0\u00bbhttps:\/\/www.linkedin.com\/in\/morgan-jamet-1a25883b\/\u00a0\u00bb _builder_version=\u00a0\u00bb4.4.1&Prime;]<\/p>\n<p>Abogado del Colegio de Abogados de Par\u00eds desde 1999, a\u00f1o de colegiaci\u00f3n. Titular de un M\u00e1ster (D.E.A.) en Derecho de Contratos de la Universidad de Derecho Jean Monnet (Par\u00eds XI).<\/p>\n<p>[\/et_pb_team_member][\/et_pb_column][et_pb_column type=\u00a0\u00bb1_2&Prime; _builder_version=\u00a0\u00bb4.3.4&Prime;][et_pb_team_member name=\u00a0\u00bbJEFFERSON LARUE\u00a0\u00bb position=\u00a0\u00bbavocat associ\u00e9\u00a0\u00bb image_url=\u00a0\u00bbhttp:\/\/cabinet-arst.com\/wp-content\/uploads\/2019\/08\/Jefferson-Larue-ARST.jpg\u00a0\u00bb linkedin_url=\u00a0\u00bbhttps:\/\/www.linkedin.com\/in\/jefferson-larue-025813a5\/\u00a0\u00bb _builder_version=\u00a0\u00bb4.4.1&Prime;]<\/p>\n<p>Abogado del Colegio de Abogados de Par\u00eds desde el a\u00f1o 2000, titular de un M\u00e1ster (D.E.S.S.) en Derecho de los Negocios (en colaboraci\u00f3n con HEC) de la Universidad Jean Monnet (Par\u00eds XI).\u00a0<\/p>\n<p>[\/et_pb_team_member][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Francia acaba de pasar a la fase 3 de la epidemia de Coronavirus que actualmente est\u00e1 arrasando el pa\u00eds. Muchos sectores (turismo, transporte, eventos, hoteles, entretenimiento, cultura, etc.) ya est\u00e1n siendo impactados por la fuerte ca\u00edda de la demanda y las cancelaciones causadas por las medidas tomadas por los poderes p\u00fablicos, as\u00ed como al comportamiento [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"on","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[17],"tags":[],"class_list":["post-4083","post","type-post","status-publish","format-standard","hentry","category-derecho-de-contratos"],"_links":{"self":[{"href":"https:\/\/llc.bypi.fr\/2021\/arst\/wp-json\/wp\/v2\/posts\/4083","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/llc.bypi.fr\/2021\/arst\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/llc.bypi.fr\/2021\/arst\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/llc.bypi.fr\/2021\/arst\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/llc.bypi.fr\/2021\/arst\/wp-json\/wp\/v2\/comments?post=4083"}],"version-history":[{"count":0,"href":"https:\/\/llc.bypi.fr\/2021\/arst\/wp-json\/wp\/v2\/posts\/4083\/revisions"}],"wp:attachment":[{"href":"https:\/\/llc.bypi.fr\/2021\/arst\/wp-json\/wp\/v2\/media?parent=4083"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/llc.bypi.fr\/2021\/arst\/wp-json\/wp\/v2\/categories?post=4083"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/llc.bypi.fr\/2021\/arst\/wp-json\/wp\/v2\/tags?post=4083"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}